The University of Maryland campus blanketed in snow

The front of McKeldin Library on Jan. 16, 2024 after multiple inches of snow blanketed campus. (Giuseppe LoPiccolo/The Diamondback)
Children sled down a hill behind McKeldin Library on Jan. 16, 2024. (Giuseppe LoPiccolo/The Diamondback)
The exterior of the Campus Farm on Jan. 18, 2024. (Neelay Sachdeva/The Diamondback)
The exterior of the Thomas V. Miller Jr. Administration Building on Jan. 16, 2024 after campus was covered in snow. (Giuseppe LoPiccolo/The Diamondback)

Continued Purple Line construction along Campus Drive

The Purple Line construction site outside Hornbake Library on Jan. 25, 2024. (Neelay Sachdeva/The Diamondback)

Iron Rooster’s opening below The Hotel at the University of Maryland

The Iron Rooster restaurant under The Hotel at the University of Maryland on Jan. 25, 2024. (Neelay Sachdeva/The Diamondback)
The newly opened Iron Rooster alongside other shops in the retail space under The Hotel at the University of Maryland on Jan. 25, 2024. (Neelay Sachdeva/The Diamondback)

Increasingly visible Panera Bread construction inside Stamp Student Union

Construction boards cover the Panera Bread being built in Stamp Student Union on Jan. 25, 2024. (Daryl Perry/The Diamondback)
Signs hang outside the Panera Bread construction site in Stamp Student Union on Jan. 25, 2024. (Daryl Perry/The Diamondback)